geodynamics036006.gif
geodynamics036005.gif
geodynamics036004.gif
geodynamics036003.gif
triangle.gif
triangle.gif
RAREST
SUBSIMIN
triangle.gif
DECALAJ
triangle.gif
GEODIN
geodynamics036002.gif
DECALAJ
baraj_small.jpg
Back
geodynamics036001.gif
PHASES
RESEARCH
PROJECTS
Abstract
Participants
Objectives
Results
worldglob.gif
Phase II (06.12.2006 - 30.06.2007 )
Creation of the measurement system in the dam's structure and in the local tectonics.
Phase III (31.06.2007 - 20.11.2007)
Collecting of the field data, making in-situ measurements and reporting at the national system of permanent stations.
Phase IV (21.11.2007 - 28.02.2008)
Preliminary processing of data from first measurements for the refference system and periodic repetition of measurements on the dam and in local tectonics.
PhaseV (29.02.2008 - 20.09.2008)
Permanent procession of data from the dam' structure and of the data from the permanent stations. Calculus of the displacement vectors for establishing the risk factor and finding solutions for diminish the risk.
Phase I (01.09.2006 - 05.12.2006)
Designing the measurement system following the project of the dam and the tectonical and geological local structure.
Act. I.1 : Designing the system of the satellite and geodesic markers in the structure of the dam.
Act.I.2 : Creation of the earthquakes catalogue from the area of the Vidraru dam.
geodynamics002001.gif
VELOROM
geodynamics001004.gif
LINKS
geodynamics001003.gif
CONTACT
geodynamics001002.gif
HOME
geodynamics002001.gif
TRAPAWA